diff options
Diffstat (limited to 'kernel/sched/deadline.c')
-rw-r--r-- | kernel/sched/deadline.c | 8 |
1 files changed, 4 insertions, 4 deletions
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c index 9bedd148f007..f59e5c19d944 100644 --- a/kernel/sched/deadline.c +++ b/kernel/sched/deadline.c @@ -708,7 +708,7 @@ static struct rq *dl_task_offline_migration(struct rq *rq, struct task_struct *p } /* - * And we finally need to fixup root_domain(s) bandwidth accounting, + * And we finally need to fix up root_domain(s) bandwidth accounting, * since p is still hanging out in the old (now moved to default) root * domain. */ @@ -992,7 +992,7 @@ static inline bool dl_is_implicit(struct sched_dl_entity *dl_se) * is detected, the runtime and deadline need to be updated. * * If the task has an implicit deadline, i.e., deadline == period, the Original - * CBS is applied. the runtime is replenished and a new absolute deadline is + * CBS is applied. The runtime is replenished and a new absolute deadline is * set, as in the previous cases. * * However, the Original CBS does not work properly for tasks with @@ -1294,7 +1294,7 @@ int dl_runtime_exceeded(struct sched_dl_entity *dl_se) * Since rq->dl.running_bw and rq->dl.this_bw contain utilizations multiplied * by 2^BW_SHIFT, the result has to be shifted right by BW_SHIFT. * Since rq->dl.bw_ratio contains 1 / Umax multiplied by 2^RATIO_SHIFT, dl_bw - * is multiped by rq->dl.bw_ratio and shifted right by RATIO_SHIFT. + * is multiplied by rq->dl.bw_ratio and shifted right by RATIO_SHIFT. * Since delta is a 64 bit variable, to have an overflow its value should be * larger than 2^(64 - 20 - 8), which is more than 64 seconds. So, overflow is * not an issue here. @@ -2493,7 +2493,7 @@ static void pull_dl_task(struct rq *this_rq) src_rq = cpu_rq(cpu); /* - * It looks racy, abd it is! However, as in sched_rt.c, + * It looks racy, and it is! However, as in sched_rt.c, * we are fine with this. */ if (this_rq->dl.dl_nr_running && |