summaryrefslogtreecommitdiff
path: root/kernel/sched
diff options
context:
space:
mode:
authorOleg Nesterov <oleg@redhat.com>2014-10-09 21:32:32 +0200
committerIngo Molnar <mingo@kernel.org>2014-10-28 10:47:55 +0100
commitdfa50b605c2a933b7bb1c1d575a0da4e897e3c7d (patch)
tree9f7367d79ba89c8d151a19bedcfb373b90d2c941 /kernel/sched
parent1a43a14a5bd9c32dbd7af35e35a5afa703944bcb (diff)
sched: Make finish_task_switch() return 'struct rq *'
Both callers of finish_task_switch() need to recalculate this_rq() and pass it as an argument, plus __schedule() does this again after context_switch(). It would be simpler to call this_rq() once in finish_task_switch() and return the this rq to the callers. Note: probably "int cpu" in __schedule() should die; it is not used and both rcu_note_context_switch() and wq_worker_sleeping() do not really need this argument. Signed-off-by: Oleg Nesterov <oleg@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Kirill Tkhai <tkhai@yandex.ru> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Link: http://lkml.kernel.org/r/20141009193232.GB5408@redhat.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel/sched')
-rw-r--r--kernel/sched/core.c38
1 files changed, 15 insertions, 23 deletions
diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index b4935600cd85..1b69603c1d3e 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -2220,7 +2220,6 @@ prepare_task_switch(struct rq *rq, struct task_struct *prev,
/**
* finish_task_switch - clean up after a task-switch
- * @rq: runqueue associated with task-switch
* @prev: the thread we just switched away from.
*
* finish_task_switch must be called after the context switch, paired
@@ -2232,10 +2231,16 @@ prepare_task_switch(struct rq *rq, struct task_struct *prev,
* so, we finish that here outside of the runqueue lock. (Doing it
* with the lock held can cause deadlocks; see schedule() for
* details.)
+ *
+ * The context switch have flipped the stack from under us and restored the
+ * local variables which were saved when this task called schedule() in the
+ * past. prev == current is still correct but we need to recalculate this_rq
+ * because prev may have moved to another CPU.
*/
-static void finish_task_switch(struct rq *rq, struct task_struct *prev)
+static struct rq *finish_task_switch(struct task_struct *prev)
__releases(rq->lock)
{
+ struct rq *rq = this_rq();
struct mm_struct *mm = rq->prev_mm;
long prev_state;
@@ -2275,6 +2280,7 @@ static void finish_task_switch(struct rq *rq, struct task_struct *prev)
}
tick_nohz_task_switch(current);
+ return rq;
}
#ifdef CONFIG_SMP
@@ -2313,8 +2319,7 @@ asmlinkage __visible void schedule_tail(struct task_struct *prev)
/* finish_task_switch() drops rq->lock and enables preemtion */
preempt_disable();
- rq = this_rq();
- finish_task_switch(rq, prev);
+ rq = finish_task_switch(prev);
post_schedule(rq);
preempt_enable();
@@ -2323,10 +2328,9 @@ asmlinkage __visible void schedule_tail(struct task_struct *prev)
}
/*
- * context_switch - switch to the new MM and the new
- * thread's register state.
+ * context_switch - switch to the new MM and the new thread's register state.
*/
-static inline void
+static inline struct rq *
context_switch(struct rq *rq, struct task_struct *prev,
struct task_struct *next)
{
@@ -2365,14 +2369,9 @@ context_switch(struct rq *rq, struct task_struct *prev,
context_tracking_task_switch(prev, next);
/* Here we just switch the register state and the stack. */
switch_to(prev, next, prev);
-
barrier();
- /*
- * this_rq must be evaluated again because prev may have moved
- * CPUs since it called schedule(), thus the 'rq' on its stack
- * frame will be invalid.
- */
- finish_task_switch(this_rq(), prev);
+
+ return finish_task_switch(prev);
}
/*
@@ -2854,15 +2853,8 @@ need_resched:
rq->curr = next;
++*switch_count;
- context_switch(rq, prev, next); /* unlocks the rq */
- /*
- * The context switch have flipped the stack from under us
- * and restored the local variables which were saved when
- * this task called schedule() in the past. prev == current
- * is still correct, but it can be moved to another cpu/rq.
- */
- cpu = smp_processor_id();
- rq = cpu_rq(cpu);
+ rq = context_switch(rq, prev, next); /* unlocks the rq */
+ cpu = cpu_of(rq);
} else
raw_spin_unlock_irq(&rq->lock);