summaryrefslogtreecommitdiff
path: root/Documentation/scheduler
diff options
context:
space:
mode:
authorLuca Abeni <luca.abeni@unitn.it>2015-05-18 15:00:25 +0200
committerIngo Molnar <mingo@kernel.org>2015-05-19 08:39:19 +0200
commit3a3a58d4068382cf2e05f5c8fd3a0587836dacec (patch)
treeba17bb382d1f9257121e126e3eaf1a5381f95edd /Documentation/scheduler
parent3aed357ee499c71f589a2537af6ec7785029873f (diff)
sched/dl/Documentation: Switch to American English
This file previously mixed American and British English; switch to American for consistency. Signed-off-by: Luca Abeni <luca.abeni@unitn.it> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: henrik@austad.us Cc: juri.lelli@gmail.com Cc: raistlin@linux.it Link: http://lkml.kernel.org/r/1431954032-16473-3-git-send-email-luca.abeni@unitn.it Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'Documentation/scheduler')
-rw-r--r--Documentation/scheduler/sched-deadline.txt32
1 files changed, 16 insertions, 16 deletions
diff --git a/Documentation/scheduler/sched-deadline.txt b/Documentation/scheduler/sched-deadline.txt
index 194664bb8bbf..af40d6cc776b 100644
--- a/Documentation/scheduler/sched-deadline.txt
+++ b/Documentation/scheduler/sched-deadline.txt
@@ -43,7 +43,7 @@ CONTENTS
"deadline", to schedule tasks. A SCHED_DEADLINE task should receive
"runtime" microseconds of execution time every "period" microseconds, and
these "runtime" microseconds are available within "deadline" microseconds
- from the beginning of the period. In order to implement this behaviour,
+ from the beginning of the period. In order to implement this behavior,
every time the task wakes up, the scheduler computes a "scheduling deadline"
consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then
scheduled using EDF[1] on these scheduling deadlines (the task with the
@@ -63,7 +63,7 @@ CONTENTS
In more details, the CBS algorithm assigns scheduling deadlines to
tasks in the following way:
- - Each SCHED_DEADLINE task is characterised by the "runtime",
+ - Each SCHED_DEADLINE task is characterized by the "runtime",
"deadline", and "period" parameters;
- The state of the task is described by a "scheduling deadline", and
@@ -78,7 +78,7 @@ CONTENTS
then, if the scheduling deadline is smaller than the current time, or
this condition is verified, the scheduling deadline and the
- remaining runtime are re-initialised as
+ remaining runtime are re-initialized as
scheduling deadline = current time + deadline
remaining runtime = runtime
@@ -129,7 +129,7 @@ CONTENTS
A typical real-time task is composed of a repetition of computation phases
(task instances, or jobs) which are activated on a periodic or sporadic
fashion.
- Each job J_j (where J_j is the j^th job of the task) is characterised by an
+ Each job J_j (where J_j is the j^th job of the task) is characterized by an
arrival time r_j (the time when the job starts), an amount of computation
time c_j needed to finish the job, and a job absolute deadline d_j, which
is the time within which the job should be finished. The maximum execution
@@ -137,20 +137,20 @@ CONTENTS
A real-time task can be periodic with period P if r_{j+1} = r_j + P, or
sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally,
d_j = r_j + D, where D is the task's relative deadline.
- The utilisation of a real-time task is defined as the ratio between its
+ The utilization of a real-time task is defined as the ratio between its
WCET and its period (or minimum inter-arrival time), and represents
the fraction of CPU time needed to execute the task.
- If the total utilisation sum_i(WCET_i/P_i) is larger than M (with M equal
+ If the total utilization sum_i(WCET_i/P_i) is larger than M (with M equal
to the number of CPUs), then the scheduler is unable to respect all the
deadlines.
- Note that total utilisation is defined as the sum of the utilisations
+ Note that total utilization is defined as the sum of the utilizations
WCET_i/P_i over all the real-time tasks in the system. When considering
multiple real-time tasks, the parameters of the i-th task are indicated
with the "_i" suffix.
- Moreover, if the total utilisation is larger than M, then we risk starving
+ Moreover, if the total utilization is larger than M, then we risk starving
non- real-time tasks by real-time tasks.
- If, instead, the total utilisation is smaller than M, then non real-time
+ If, instead, the total utilization is smaller than M, then non real-time
tasks will not be starved and the system might be able to respect all the
deadlines.
As a matter of fact, in this case it is possible to provide an upper bound
@@ -160,13 +160,13 @@ CONTENTS
maximum tardiness of each task is smaller or equal than
((M − 1) · WCET_max − WCET_min)/(M − (M − 2) · U_max) + WCET_max
where WCET_max = max_i{WCET_i} is the maximum WCET, WCET_min=min_i{WCET_i}
- is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilisation.
+ is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilization.
If M=1 (uniprocessor system), or in case of partitioned scheduling (each
real-time task is statically assigned to one and only one CPU), it is
possible to formally check if all the deadlines are respected.
If D_i = P_i for all tasks, then EDF is able to respect all the deadlines
- of all the tasks executing on a CPU if and only if the total utilisation
+ of all the tasks executing on a CPU if and only if the total utilization
of the tasks running on such a CPU is smaller or equal than 1.
If D_i != P_i for some task, then it is possible to define the density of
a task as C_i/min{D_i,P_i}, and EDF is able to respect all the deadlines
@@ -176,9 +176,9 @@ CONTENTS
On multiprocessor systems with global EDF scheduling (non partitioned
systems), a sufficient test for schedulability can not be based on the
- utilisations (it can be shown that task sets with utilisations slightly
+ utilizations (it can be shown that task sets with utilizations slightly
larger than 1 can miss deadlines regardless of the number of CPUs M).
- However, as previously stated, enforcing that the total utilisation is smaller
+ However, as previously stated, enforcing that the total utilization is smaller
than M is enough to guarantee that non real-time tasks are not starved and
that the tardiness of real-time tasks has an upper bound.
@@ -218,10 +218,10 @@ CONTENTS
no guarantee can be given on the actual scheduling of the -deadline tasks.
As already stated in Section 3, a necessary condition to be respected to
- correctly schedule a set of real-time tasks is that the total utilisation
+ correctly schedule a set of real-time tasks is that the total utilization
is smaller than M. When talking about -deadline tasks, this requires that
the sum of the ratio between runtime and period for all tasks is smaller
- than M. Notice that the ratio runtime/period is equivalent to the utilisation
+ than M. Notice that the ratio runtime/period is equivalent to the utilization
of a "traditional" real-time task, and is also often referred to as
"bandwidth".
The interface used to control the CPU bandwidth that can be allocated
@@ -251,7 +251,7 @@ CONTENTS
The system wide settings are configured under the /proc virtual file system.
For now the -rt knobs are used for -deadline admission control and the
- -deadline runtime is accounted against the -rt runtime. We realise that this
+ -deadline runtime is accounted against the -rt runtime. We realize that this
isn't entirely desirable; however, it is better to have a small interface for
now, and be able to change it easily later. The ideal situation (see 5.) is to
run -rt tasks from a -deadline server; in which case the -rt bandwidth is a